New year New Path

This is my first week back in the inequity lab and I have picked up work right where I left off. I have started out by scraping the...

week 12

IN this week I am continuing to develop the assembly that will switch on and off the lights. Despite the design being strong of paper the...

week 11

n this week we are being to assemble the light switch itself. I have finally finished up all wiring and run successful test. This is...

Week 10

This time I came back form brake with a plan this was to get the motor turning and to use a switch to display a value that will later be...

Number 9

This week in class we would on AT commands this is what we will use to turn on the motor with Bluetooth. We successfully turn on a light...

Number 8

I have gained a lot of nolage over the corse of this past sumester mailly in coding and understanding of the equimetn and the funtion of...

week 7

In the final weeks before break I tried to solve a problem the that had been plaguing me since the beginning of the project. This was how...

week 6

In the final week be for a break I solved a major problem on uploading. I have been having this problem for a wail and have not been able...

Week two

In week two I have begun to flesh out my ideas. To start we had a plethora of ideas from automatic shoe ting devices to hdmi...

Starting Project

The first steps in getting lazy tech off the ground. This is a task hard way that I feel original thought. My original concept turned out...